QR codeQR code

Iran ready to start recovery operation in Doroud oilfield

3 Aug 2013 - 16:51


TEHRAN (FNA)- The Iranian oil ministry said it is about to start a plan of simultaneous injection of water and gas into Doroud oilfield to boost the volume of oil recovery in the field.


Managing-Director of the National Iranian Offshore Oil Company (NIOOC) Mahmoud Zirakchianzadeh said that simultaneous water and gas injection into the Doroud oil field, located off the Persian Gulf island of Kharg in Southern Iran, would enhance its recovery rate from 23 to 33 percent.

Water injection is a method of improved oil recovery (IOR) applied to offshore reservoirs, said Zirakchianzadeh on Friday.

“Currently, 400,000 barrels per day (bpd) of water are injected into the NIOOC-administered fields aimed at increasing oil output. The figure will reach 500,000 to 530,000 bpd by the end of the current Iranian calendar year (to end March 21, 2014),” the official added.

The NIOOC as one of the largest oil companies operating in offshore sector produces a great part of the country's oil and gas in 1,200 kilometers of the Persian Gulf waters. The company comprises six operation districts including Bahregan, Lavan, Siri, Kharg, Kish and Qeshm.

By Fars News Agency

 

The Iran Project is not responsible for the content of quoted articles.


Story Code: 42877

News Link :
https://www.theiranproject.com/en/news/42877/iran-ready-to-start-recovery-operation-in-doroud-oilfield

The Iran Project
  https://www.theiranproject.com